Skip to main content

HSQ

Commercial Solar, Melbourne & Victoria

Future-Proof Your Property For The EV Transition.

Commercial EV charging stations attract tenants, customers, and staff, and increasingly, they’re expected. HSQ Electrical designs and installs commercial EV charging infrastructure for offices, retail, car parks, and fleet operations.

Why Commercial EV Charging Matters Now

EV Adoption Is Accelerating, Your Property Needs To Keep Up.

Australia’s EV market is expanding rapidly. Tenants ask about it. Customers expect it. Staff increasingly need it. Commercial properties without EV charging will become less attractive to occupants, retailers, and employees over the next 5-10 years.

The good news: installing commercial EV charging infrastructure now is far cheaper than retrofitting later. And smart load management systems mean you don’t need to upgrade your switchboard supply just to install charging.

How We Work

From Site Survey To Switch-On.

1

Site Assessment

We assess existing electrical capacity, evaluate site layout, and confirm what’s possible without supply upgrades.

2

System Design & Quote

Custom design including charger selection, load management strategy, civil works, and itemised quote.

3

Approvals & Coordination

We handle distributor coordination, body corporate approvals, and any required permits.

4

Installation & Commissioning

Professional installation including civil works, cabling, charger mounting, and full commissioning.

5

Handover & Training

User training, billing platform setup (where applicable), and ongoing support.

Why Choose HSQ Electrical

Commercial EV Done Right.

Charger-Agnostic Design

We work with all major commercial charger brands, recommending the right product for your application, not the one with the highest commission.

Load Management Expertise

Dynamic load management means you can install more chargers without expensive supply upgrades, we know how to design it properly.

Full Electrical Capability In-House

REC No. 28315. Switchboards, three phase upgrades, and supply increases are all in-house, no contractor coordination required.

Future-Proofed Infrastructure

We design infrastructure that supports current charging needs and easy expansion as EV adoption grows.

Ongoing Support

Maintenance, fault finding, and operator training, supporting your charging infrastructure for the long term.

Frequently Asked Questions

Commercial EV Charging FAQs.

How many EV chargers can I install on my existing supply?

Often more than you think, with smart load management. We assess your existing capacity, current load profile, and design a charging strategy that maximises chargers without requiring supply upgrades.

AC charging (7-22kW) suits vehicles parked for hours, workplaces, hotels, retail. DC fast charging (50kW+) suits short-stay applications where rapid charging is required, service stations, transit stops.

For chargers above 7kW, yes, three phase is required. We can install three phase if you don’t already have it.

Yes. Most commercial chargers support payment integration, credit card, RFID, or app-based billing, with revenue collected to your nominated account.

 

Various federal and state grants are periodically available for commercial EV infrastructure, we’ll advise on current programs at quote stage.

Get Your Property EV-Ready.

Whether it’s two workplace chargers or a 20-bay fleet depot, HSQ Electrical designs and installs commercial EV charging infrastructure built for your operation and built to last.

Get In Touch

Tell Us About Your Project.

Contact Form Demo
Your details are kept completely private and will only be used to respond to your enquiry.